Standard Series Outlet Assembly - DeWalt Graco PowerFill 3.5 Standard 26B417 Operation, Parts

Table of Contents

Advertisement

4.
Attach Power Head by inserting pins into
the holes on the pump. Power Head
should automatically align with piston
head once step 3 is complete.
NOTE: Ensure piston is properly inserted into
the Power Head prior to operation. Should
piston not align into the Power Head,
manually pull the piston up and re-align.
5.
Close ProConnect cover and tighten
thumb screw to secure Power Head.
Ensure locking screw is installed before
operation.
3A8110C
Standard Series Outlet
Assembly
1.
Assemble standard outlet to pump and
using a 1/2 in. or 13 mm wrench, tighten
flange head bolts.
2.
Assemble ring to standard series outlet
tab.
Setup
11

Advertisement

Table of Contents
loading

Table of Contents