Acceptance Report For Installation & Commissioning - Schwank MonsterFan Series Use Instruction

Table of Contents

Advertisement

9
Acceptance Report for Installation & Commissioning
Customer
Street
Postal code
Contact Person
E-Mail
Product type (s)
Serial no.
RCD usage
Special conditions
Verification by Customer
Delivery of the technical instructions
The fan has been put into operation without any problems.
(No vibrations, no noise, no error messages)
The wing surfaces are undamaged.
The product has been introduced/ instructed by a specialist.
10 min. test run without abnormalities
Installation was carried out according to customer drawings and
customer requirements
____________
Date
www.monsterfans.com
__________________________
Name / Signature
(Customer)
Date
Service techn.
Order No.
Phone
Cell phone
No. of Fans
Hub height
Kind of RCD
Adjustment of
frequencies
__________________________
Name /
(Technician)
info@monsterfans.com
Yes ☐
No ☐
Yes ☐
No ☐
Yes ☐
No ☐
Yes ☐
No ☐
Yes ☐
No ☐
Yes ☐
No ☐
Signature_
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mf-c24Mf-c20Mf-c16Mf-c12

Table of Contents