WorkHorse Sentinel User's Guide
11.2
Prepare the ADCP for Deployment
10 MB
MEMORY CARD
400 Wh BATTERY
(NOT CONNECTED)
Figure 10.
Things to remember while preparing the ADCP.
• Use the Deployment Checklist to verify that the ADCP is ready for
the deployment.
• Test the ADCP using WinSC. Some tests will fail if the ADCP is not
placed in water while the tests are being run.
• Use the AC power supply while testing the ADCP. Save the batter-
ies for deployments.
• Desiccant lasts a year at specified WorkHorse deployment depths
and temperatures. Remember that desiccant rapidly absorbs mois-
ture from normal room air. Replace the desiccant whenever the
WorkHorse housing or end-cap is removed.
• Verify the compass calibration.
page 26
POWER SUPPLY
ADCP
I/O CABLE
Prepare the ADCP
24 VDC
COMPUTER
RD Instruments