Prepare The Adcp For Deployment - RD Instruments WorkHorse User Manual

Mariner adcp
Hide thumbs Also See for WorkHorse:
Table of Contents

Advertisement

WorkHorse Mariner ADCP User's Guide
11.2

Prepare the ADCP for Deployment

INPUT POWER
DC 20-60 VOLT
DC 12 VOLT
AC 98-264 VOLT
DECK BOX (REAR VIEW)
FROM CHANNEL 1
(J20 RS-232 or J19 RS-422)
TO COMPUTER
ENSEMBLE-OUT
DEVICE
Figure 13.
Things to remember while preparing the ADCP.
page 24
TO ADCP
(CHOOSE ONE INPUT VOLTAGE)
TO
(OPTIONAL)
Prepare the ADCP
• Use the Deployment Checklist to verify that the ADCP is
ready for the deployment.
• Test the ADCP using BBTalk. Some tests will fail if the
ADCP is not placed in water while the tests are being run.
• Desiccant lasts a year at specified WorkHorse deployment
depths and temperatures. Remember that desiccant rapidly
absorbs moisture from normal room air. Replace the desic-
cant whenever the WorkHorse housing or end-cap is re-
moved.
• Verify the compass calibration.
I/O CABLE
EXTERNAL RS-232 (J28)
GYROCOMPASS DATA
TO COMPUTER
NAVAGATION
(OPTIONAL)
COMPUTER
TO J17
FROM (J22)
TO GYRO
FROM
DEVICE
RD Instruments

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents