Installation Rules - Huawei DPS Blade V100R001C50 Configuration Manual

Hide thumbs Also See for DPS Blade V100R001C50:
Table of Contents

Advertisement

DPS Blade V100R001C50 Configuration Manual
Figure 2-8 Specifications and installation modes for channel steels and angle steels

2.3.3 Installation Rules

Table 2-3 Installation rules
Installation
Scenario
Small pole
Wall
mounting
Large pole
Channel
steel
Angle steel
Issue 01 (2019-06-30)
Installation
Mode
Side
mounting
Flush
mounting
Flush
mounting
Flush
mounting
1.
Large poles do not support side mounting because of hose clamps. If side mounting on large
poles is required, submit an OR ticket to customize mounting kits.
2.
The load-bearing capacity of a pole mounting kit is limited. If three or more than three 50 Ah
lithium batteries need to be installed, you are advised to install them on different layers, as
shown in the following figure.
Copyright © Huawei Technologies Co., Ltd.
Maximum Configuration
for One Layer
Two PSUs + Two 20 Ah
lithium batteries or three
20 Ah lithium batteries
or Two PSUs + Two 50 Ah
lithium batteries
One PSU + One lithium
battery or two PSUs
One PSU + One lithium
battery or two PSUs
One lithium battery + One
PSU or two PSUs
2 Configuration Overview
Maximum System
Configuration
1. Four PSUs + Eight lithium
batteries
2. If the system configuration
exceeds the maximum
capacity for one layer,
install the devices on
different layers.
3. Hose clamps are required
for large poles.
9