Maintenance; Blocking The Elevating Assembly; Installation; Removal - Snorkel TM12 Operator's Manual

Aerial work platform
Hide thumbs Also See for TM12:
Table of Contents

Advertisement

Available languages

Available languages

M
AINTENANCE
W A R N I N G
!
Never perform service while the platform is elevated without first blocking the elevating assembly.
DO NOT stand in the elevating assembly area while deploying or storing the brace.
B
L O C K I N G T H E
I
NSTALLATION
1. Park the machine on firm level ground.
2. Verify that both Emergency Stop Switches are ON.
3. Turn and hold the Chassis Key Switch to CHASSIS.
4. Position the Chassis Lift Switch to UP and elevate the platform
approximately 1,2 m (4 ft.).
5. Place a solid wood block, 51mm x 100mm x 45cm (2"x 4"x18")
between the second mast section and Chassis just behind the
mast assembly.
6. Push the Chassis Lift Switch to the DOWN position and gradually
lower the platform until the second mast section is supported by
the block.
R
EMOVAL
1. Push the Chassis Lift Switch to the UP position and gradually raise platform until the wood block can be
removed.
2. Remove the block.
3. Push the Chassis Lift Switch to the DOWN position and completely lower the platform.
H
Y D R A U L I C
The hydraulic fluid reservoir is located in the chassis door.
NOTE: Never add fluid if the platform is elevated.
C
H
HECK
1. Make sure that the platform is fully lowered.
2. Open the chassis door.
3. Remove the filler cap from the hydraulic fluid reser-
voir.
4. Check the fluid level on the dipstick on the filler cap.
5. Add the appropriate fluid to bring the level to the FULL
mark. See "Specifications" on page 14
Operation Manual
E
L E V A T I N G
F
L U I D
F
YDRAULIC
LUID
!
A
S S E M B L Y

Maintenance

Figure 7: Supporting the Elevating Assembly
Number 2 Mast
Wood Block
Figure 8: Hydraulic Fluid Reservoir and Dipstick
Page 10