Download Print this page
Pentair Myers MSKV50 Installation And Operation Manual

Pentair Myers MSKV50 Installation And Operation Manual

Submersible sewage ejector pump

Advertisement

Quick Links

SUBMERSIBLE SEWAGE EJECTOR PUMP
MSKV50
INSTALLATION AND
OPERATION MANUAL
pentair.com

Advertisement

loading

Summary of Contents for Pentair Myers MSKV50

  • Page 1 SUBMERSIBLE SEWAGE EJECTOR PUMP MSKV50 INSTALLATION AND OPERATION MANUAL pentair.com...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS General Safety ...................................... 3 Installation ......................................4 Maintenance And Service ..................................5 Parts List ......................................7 Warranty ....................................... 8...
  • Page 3: General Safety

    GENERAL SAFETY IMPORTANT SAFETY INSTRUCTIONS BEFORE OPERATION This manual contains important instructions that should be followed during installation, operation, and maintenance of the product. Read the following in struc tions care ful ly. Reasonable care and safe meth ods should be practiced. Check local codes and This is the safety alert symbol.
  • Page 4: Installation

    INSTALLATION These important instructions must be followed for satisfactory performance of your pump. Before installation, check your local electrical and plumbing codes. Provide proper sump size to allow the pump to operate without restrictions. A two- to five-minute run time is recommended. Also, minimum 24" diameter recommended.
  • Page 5: Maintenance And Service

    MAINTENANCE AND SERVICE PUMP SERVICING Check for short. Disconnect the stator leads from the Servicing should be performed only by knowledgeable pump connector. Use an ohmmeter to check the continuity of service contractors or authorized service stations. the stator. If stator fails to pass the continuity test, it must be replaced.
  • Page 6 MAINTENANCE AND SERVICE Check the seal. Remove the rotating portion of seal Connect the capacitor to the capacitor leads. Push the (6) from shaft by inserting a screwdriver under the edge connectors of the two black stator leads onto the power of the seal and lifting it off.
  • Page 7: Parts List

    PARTS LIST MODEL – MSKV50 Description Quantity MSKV50AD110 MSKV50AD120 MSKV50AW110 MSKV50AW120 MSKV50M110 MSKV50M120 MSKV50M220 Cord 115V 10' (3.1m) 146230101 146230101 146230101 Cord 115V 20' (6.1m) 146230201 146230201 146230201 Cord 230V 20' (6.1m) 146232201 Piggyback Tethered Float 145951101 Switch 115V 10' (3.1m) Piggyback Tethered Float 145951201 Switch 115V 20' (6.1m)
  • Page 8: Warranty

    Fax: 800-526-3757 Pentair trademarks and logos are owned by Pentair or its affiliates. Third party registered and unregistered trademarks and logos are the property of their respective owners. Because we are continuously improving our products and services, Pentair reserves the right to change specifications without prior notice. Pentair is an equal opportunity employer.

This manual is also suitable for:

Mskv50ad110Mskv50ad120Mskv50aw110Mskv50aw120Mskv50m110Mskv50m120 ... Show all