POWERPLANT
AIRPLANE
OPERATIONS
MANUAL
STARTING BY USING GROUND EQUIPMENT
The system is pressurized by pneumatic ground equipment connected
to start the engine 2.
The SCV energizes to open when a starting switch ground signal
energizes the engine 2 start relay.
When the engine gas generator attains 53% N2, a validation time of
10 seconds elapses before the message "E2 ATS SOV OPN" appears
on the EICAS. At 56.4% N2 the FADEC sends a signal to engine 2
start relay be de-energized, thus the SCV is also de-energized and the
airflow stops flowing to the ATS turbine. In normal operation
conditions, 56.4% N2 is reached in less than 10 seconds.
The ATS turbine stops operating and the engine gas generator speed
increases.
Page
Code
2-10-30
3
01
REVISION 37

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EMB145 and is the answer not in the manual?

Table of Contents

Save PDF