PV-IB_IT_英表示-3.3 08.3.6 10:14 ページ87
  *  OVR
3
Flashing
  #OVR >
t 0 0
4
Flashing
Display panel
>
Vg 3
2 0 . 5V
 
Vp 7
2 4 . 3V
Vg 3
2 0 . 5V
. 6 s
 
Vp 3
2 0
. 8V
Procedure
Press the ENTER switch.
・AUTO TEST starts up in 'OVR'.
・Vg: Current grid voltage is dis-
played.
・Vp: Stabilizing voltage in 'OVR' falls.
"*" flashes to indicate that the test is
in progress.
When your PV inverter is up and starts
running in 'OVR', then its built-in relay
for grid turns off with "#" turned on on
the LCD.
・Vg: Grid voltage in 'OVR' is dis-
played.
・Vp: Stabilizing voltage in 'OVR' is
displayed.
・t: Operating time in 'OVR' is dis-
played.
This completes the AUTO TEST in
'OVR'. Please proceed to step 5
below.
If the AUTO TEST in 'OVR' is aborted,
● ●
then '---' is displayed to the right of 't', 'Vg'
and 'Vp' on the LCD. In such a case, sim-
ply move to step 14 below, in the mean-
time, to exit the "AUTO TEST" mode.
87