Electrical Requirements; Plumbing Requirements - Bunn OT Operating & Service Manual

Bunn ot: user guide
Table of Contents

Advertisement

ELECTRICAL REQUIREMENTS

CAUTION - Do not connect the brewer to the power source until specified in Initial Set-Up.
WHITE
NEUTRAL
120V.A.C.
L1 BLACK
MODELS OT15 & 20 require 2-
wire, grounded service rated
120 volts ac, 15 or 20 amp re-
spectively, single phase, 60 Hz.
Model 15 has an attached
cordset.
Electrical Hook-Up
Model OT15 has an attached cordset.
Models OT20, OT35, & RT35, proceed as follows:
CAUTION – Improper electrical installation will dam-
age electronic components.
1.
An electrician must provide electrical service as
specified.
2.
Using a voltmeter, check the voltage and color
coding of each conductor at the electrical source.
3.
Remove the front panel beneath the sprayhead
and rotate the control thermostat knob fully
counterclockwise to the "OFF" position and re-
place the panel.
4.
Remove the rear panel, feed the cord through
the strain relief, and connect it to the terminal
block.
5.
Connect the brewer to the power source and
verify the voltage at the terminal block before
proceeding. Replace the rear panel.
6.
If plumbing is to be hooked-up later be sure the
brewer is disconnected from the power source.
If Plumbing has been hooked-up, the brewer is
ready for Initial Set-Up.

PLUMBING REQUIREMENTS

This brewer must be connected to a cold water
system with operating pressure between 20 and 90
psi from a 1/2" or larger supply line. A shut-off valve
should be installed in the line before the brewer. In-
stall a regulator in the line when pressure is greater
than 90 psi to reduce it to 50 psi. The water inlet
fitting is 1/4" flare.
L2 RED
120V.A.C.
WHITE
208 or 240V.A.C.
NEUTRAL
120V.A.C.
L1 BLACK
MODELS OT35 & RT35 require
3-wire, grounded service rated
120/208 or 120/240 volts ac, 20
amp, single phase, 60 Hz.
L2 RED
L1 BLACK
MODELS OTA, RTA & RT35B
require 2-wire, grounded ser-
vice rated 240 volts ac or 200
volts ac, 20 amp single phase,
50 Hz.
NOTE - Bunn-O-Matic recommends 1/4" copper tub-
ing for installations of less than 25 feet and 3/8" for
more than 25 feet from the 1/2" water supply line. A
tight coil of copper tubing in the water line will facili-
tate moving the brewer to clean the counter top. Bunn-
O-Matic does not recommend the use of a saddle valve
to install the brewer. The size and shape of the hole
made in the supply line by this type of device may
restrict water flow.
This equipment must be installed to comply
with the Basic Plumbing Code of the Build-
ing Officials and Code Administrators Inter-
national, Inc. (BOCA) and the Food Service
Sanitation Manual of the Food and Drug Ad-
ministration (FDA).
Page 4
RED
NEUTRAL
200 OR 240V.A.C.
L1 BLACK
MODEL RT25B requires 2-
wire, grounded service
rated 100 volts ac, 20 amp
single phase, 50 Hz.
100V.A.C.
P1709
10021 101598

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt

Table of Contents