Summary of Contents for Salamander Designs SYNERGY QUAD UNIT
Page 1
SYNERGY QUAD UNIT - SQ20 / SQ30 WARNING: If you are installing accessories such as doors or drawers to the base unit, read all instructions for the accessory and install in conjunction with these instructions. ALUMINUM POSTS CONNECTOR BOLTS TOP SHELF...
Page 2
Limited Warranty For five full years Salamander Designs Ltd. will repair or replace, at our option, any product defective in materials or craftsmanship. Salamander Designs Ltd. will not be responsible for any damage to or destruction of other equipment consequential to our equipment failure. Defective product must be given Return Authorization and is to be returned to the factory prepaid, in the original carton and packing material.
Page 3
Connect Posts to Bottom Shelf Add Shelves WARNING: If you are installing an optional door or drawer refer WARNING: Tighten by screwing the leveler foot NOT the post. to specific instructions before proceeding. Square Post Connect Post Insert shelf pegs down each post as shown. Square the post to the bottom shelf.
Page 4
Attach Rear Panel & Top Shelf Adjust Shelf Pegs & Add Shelves Insert & Align Studs Combine the 1” threaded studs with the flat nuts. Slide hardware into rear posts. Adjusting Shelves Use the Spacer Tool to align top and bottom studs. Insert peg down the post channel and position the peg through the Spacer and tighten.
Page 5
SYNERGY BASE UNIT - SU20 / SU30 / SU40 WARNING: If you are installing accessories such as doors or drawers to the base unit, read all instructions for the accessory and install in conjunction with these instructions. CONNECTOR BOLTS TOP SHELF ALUMINUM POSTS RUBBER...
Limited Warranty For five full years Salamander Designs Ltd will repair or replace, at our option, any product defective in materials or craftsmanship. Salamander Designs Ltd. will not be responsible for any damage to or destruction of other equipment consequential to our equipment fail- ure.
Page 7
Connect Posts to Bottom Shelf Add Shelf Pegs WARNING: If you are installing an optional door or drawer WARNING: Tighten by screwing the leveler foot NOT the post. refer to specific instructions before proceeding. Square Post Square the post to the bottom Insert all shelf pegs and heavy shelf shelf.
Page 8
Attach Rear Panel Adjust Shelf Pegs & Add Shelves Adjusting Shelves Insert Hardware Insert peg down the post channel Combine the 1” threaded studs and position the peg through the with the flat nuts. Slide hardware Spacer and tighten. You may also into rear channel consider using books or CD’s for 8"...
Page 9
SYNERGY TRIPLE UNIT - SL20 / SL30 / SL40 WARNING: If you are installing accessories such as doors or drawers to the base unit, read all instructions for the accessory and install in conjunction with these instructions. CONNECTOR BOLTS ALUMINUM POSTS TOP SHELF (A) SHELF PEGS BOTTOM SHELF...
Page 10
Limited Warranty For five full years Salamander Designs Ltd. will repair or replace, at our option, any product defective in materials or craftsmanship. Salamander Designs Ltd. will not be responsible for damage to or destruction of other equipment consequential to our equipment failure. Defective product must be given Return Authorization and is to be returned to the factory prepaid, in the original carton and packing material.
Page 11
Connect Posts to Bottom Shelf Add Shelf Pegs WARNING: If you are installing an optional door or drawer refer WARNING: Tighten by screwing the leveler foot NOT the post. to specific instructions before proceeding. Square Post Connect Post Square the post to the bottom shelf. Screw foot with metal washer through bottom shelf and onto the end of Insert all shelf pegs down each post.
Page 12
Attach Rear Panel & Top Shelf Adjust Shelf Pegs & Add Shelves Insert & Align Adjusting Shelves Studs Combine Insert peg down the post channel the 1” threaded studs with and position the peg through the the flat nuts. Slide hardware into Spacer and tighten.
Page 13
SYNERGY TWIN UNIT - SN20 / SN30 / SN40 WARNING: If you are installing accessories such as doors or drawers to the base unit, read all instructions for the accessory and install in conjunction with these instructions. CONNECTOR BOLTS TOP SHELF ALUMINUM POSTS RUBBER TAB FLAT NUT...
Page 14
Limited Warranty For five full years Salamander Designs Ltd will repair or replace, at our option, any product defective in materials or craftsmanship. Salamander Designs Ltd. will not be responsible for damage to or destruction of other equipment consequential to our equipment failure. Defective product must be given Return Authorization and is to be returned to the factory prepaid, in the original carton and packing material.
Page 15
Connect Posts to Bottom Shelf Add Shelf Pegs WARNING: If you are installing an optional door or drawer refer to WARNING: Tighten by screwing the leveler foot NOT the post. specific instructions before proceeding. Square Post Square the post to the bottom shelf. Insert all shelf pegs and heavy shelf brackets (SN40 only) down each post.
Page 16
Attach Rear Panel Adjust Shelf Pegs / Add Shelves Insert Hardware Adjusting Shelves Combine the 1” threaded studs Insert peg down the post channel with the flat nuts. Slide hardware and position the peg through the into rear channel Spacer and tighten. You may also consider using books or CD’s for shelf spacing.
Need help?
Do you have a question about the SYNERGY QUAD UNIT and is the answer not in the manual?
Questions and answers