Handle/Lock Installation - Perlick HP15 Installation Instructions Manual

Hide thumbs Also See for HP15:
Table of Contents

Advertisement

12) Place the lower V-block into the lower cabinet hinge
with the notch parallel to the cabinet (Fig. 15).
Figure 15. Installing V-Block
13) Lift the door assembly and insert the top pin into the
bearing. Move door toward cabinet and align the V-blocks
(Fig. 16).
Figure 16. Installing Door
14) Insert and tighten the lower hinge pin to complete
the assembly.
PERLICK RESIDENTIAL UNDERCOUNTER INSTALLATION MANUAL
HANDLE INSTALLATION
CAUTION
overlay only (not the actual door) to avoid damage to
the factory door.
1. Handle must be attached to the overlay before
mounting the overlay onto the door. Mark the rear
of the wood overlay panel with handle fastening
locations.
2. Drill through the wood overlay panel at marked
locations, taking care not to damage the panel.
3. Countersink screw heads so that screw heads are flush
with the back side of the panel. Attach the handle to
the overlay panel.
CAUTION
avoid damage or errors in workmanship.
DOOR LOCK INSTALLATION
NOTE: Full size lock installation wood overlay panel templates
are available on the Perlick website. Visit www.perlick.com/
Residential, click on Service & Support, and then choose
Wood Overlay Templates from the menu. Lock templates are
available for all HP, HC, HA and HH series models. Take care in
choosing the correct template for your specific model.
When installing to a wood overlay, perform the lock
installation before mounting the wood overlay to the
door!
1. See Figure 17 below. Attach mounting bracket to
wood overlay.
2. Insert lock body and attach with nut.
Figure 17. Installing Door Lock
The handle mounting on the wood
overlay should be mounted on the
Proper woodworking materials
and equipment should be used to
r
Perlick customer service (800)558-5592 | 11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents