Step 5 Connect the charging cable to the reserved pad.
----End
5.4.19 Replacing a PAD Power Connector
Context
Item
PAD power connector
PAD power connector
PAD power connector
holder
Impact on the System
The PAD cannot be charged.
Preparations
●
●
Procedure
Step 1 Turn off the upstream power switch for the PAD power connector.
Step 2 Remove the baffle plate under the power connector.
Step 3 Remove the charging cable from the power connector.
Step 4 Remove the PAD power connector and its holder from the door box.
Issue 01 (2020-12-25)
Tool: Phillips screwdriver
Materials: PAD power connector, PAD power connector holder