Maintenance Intervals; Repairs; Checking The Central Heating Room - Eco Engineering Easypell Operating Manual

Hide thumbs Also See for Easypell:
Table of Contents

Advertisement

52

Maintenance intervals

11.3 Maintenance intervals
Eco Engineering systems recommends regular/annual maintenance by a qualified person.
The volume of maintenance beyond the cleaning of the boiler also contains for example a check of equip-
ment, components and safety systems, if necessary the adaption of adjustments, trial operation and produc-
tion of a maintenance report.

11.4 Repairs

Only authorised specialists may carry our repair work on this system. Use original Eco Engineering spare
parts only. Not using original Eco Engineering spare parts will cause the warranty to become void.

11.5 Checking the central heating room

Checking the pellet heating system regularly prevents malfunctions and unexpected failure of the heating
system.
Central heating room
Make sure that no flammable materials are stored in the central heating room.
Make sure that no washing is hanging in the central heating room.
Check the display at the control panel for malfunction messages.
Check the flue gas tube and chimney. Let them clean regularly (at least once per year).
200013_EN 2.0

Advertisement

Table of Contents
loading

Table of Contents