2.2.4. The hang point spreader bar turn perpendicular to the keel tube.
Fig. 6
2.2.5. Attach the shackle of the cross-beam tensioning wires to the hook which is placed on the keel
tube (Fig. 7). Check that cross-beam wires and VG ropes are not twisted.
Fig. 7
7