Siemens SINAMICS G120 Hardware Installation Manual page 45

Power module
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Connect cables at the converter so that they are EMC compliant
Attach the cable tie holders to the Power Mod‐
ule as shown to the left in the diagram before
you establish the connections.
Fix the line connecting cable using a cable tie
as shown in
Fix the shield of the motor connecting cable
using a hose clamp (
Connect the shield of the control cable with the
shield plate of the Control Unit (
steel band. Also attach the control cable to the
Power Module using a cable tie (
PM250 Power Module
Hardware Installation Manual, 04/2021, A5E36265179B-AB
.
).
) using a
).
5.5 Connecting the line supply and motor
Connection
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pm250

Table of Contents