  • Page 1 Tiffany Victorian assembly instructions Laser Dollhouse Designs...
  • Page 2 Tiffany Victorian Parts Oval door First Floor base Second Floor base Third Floor base French frames (2) Door (1) Half oval(2) Interior doors (5) Subfloor support rails Exterior doors (2) Straight stairs (2) Alcove roof panels Unassembled Main roof panels...
  • Page 3 NOTE: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also give you a chance to visualize how you want to approach the build. Materials for build; 1.
  • Page 4 NOTE: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also give you a chance to visualize how you want to approach the build. Instructions cover basic assembly not when to paint, stain, or glue as this depends on you build and what you are adding.
  • Page 5 Step 3. Install Interior and exterior doors to walls and frames. See figure 3 ONLY GLUE IN FINAL ASSEMBLY. Figure 3 Step 4. Install walls 1A thru 1M to assembled first floor base. See figure 4. Figure 4...
  • Page 6 Step 5. Install second floor on to the first floor walls. Figure 5 Figure 5 Step 6. Stairs assembly, locate stair case. The bottom riser (step) is the side with the ¼ “ square dowel. Figure 6 Bottom Figure 6...
  • Page 7 Step 7. Install tread to each step. For this house we will have our handrail on the right side. Make sure to glue in place with the square cutouts to the right for your spindles. Figure 7 Figure 7 Step 8. Install the spindles with the slop facing back. As in Figure 8.
  • Page 8 Step 9. with spindles installed, now glue to the front riser a newel post. Make sure post is aligned to the outside of the first riser and the spindles are centered. Figure 9 Figure 9 Step 10. Install the handrail. First glue to lower newel post, view rail angle to spindles and starting from the bottom glue each spindle to rail.
  • Page 9 Step 11. Glue top Newel post to front of handrail and top tread. Figure 11 repeat steps for second floor stairs. Paint and let dry. Step 12. assemble side long safety stair rails (x2), using 5 spindles evenly spaced along the rail and mark.
  • Page 10 Step 13. install top handrail making sure it aligns to bottom rail. Figure 14. repeat steps for second set for third floor. Figure 14 Step 14. Using 3 spindles repeat steps to assemble as you did earlier. Figure 15 you should now have one short and two long sets of safety rails Figure 15...
  • Page 11 Step 16. Locate porch stair assembly, figure 17 Figure 17 Step 17. Apply treads with cutouts evenly across each step. Figure 18. Figure 18 Step 18. Install stair spindles with angle towards front. Figure 19, make sure each one seat in the cutout. Figure 19...
  • Page 12 Step 19. Install a newel post to each end gluing to the front riser (step) and aligned to edge of stair assembly, centered with spindles. Figure 20. Figure 20 Step 20. Install handrails by gluing to newel post and centering onto spindles. Figure 21, paint and let dry.
  • Page 13 Step 22. Install single run safety rail and the second floors walls. Figure 23. Make sure all doors, door frames and windows are installed prior to gluing. Figure 23 Step 23. Install third floor onto second floor walls, glue and let dry. Figure 24 Figure 24...
  • Page 14 Step 24. Install stairs and glue flush to third floor. Figure 25 Figure 25 Step 25. Using wall 3A as reference install “L” shaped safety rail aligning to wall and front of stair post. Figure 26. Figure 26...
  • Page 15 Step 26. Install 3 floor walls 3A, 3B, and 3C. Figure 27. Make sure doors, door frames, and windows and installed prior to gluing. Figure 27 Step 27. Install main roof panels front and rear and glue third floor down. Figure 28. Figure 28...
  • Page 16 Step 28. Install 3 floor walls 3D and 3E, figure 30 Figure 30 Step 29. Install front Alcove roof panels and glue down in place. Figure 31 From the inside align alcove panels to main roof opening and glue in place. Figure 32 Figure 31 Figure 32...
  • Page 17 Step 30. Install Main roof running trim. Figure 33 Figure 33 Step 31. Install front Alcove roof gables. Figure 34 Figure 34 Step 32. Install main roof side gables. Figure 35 Figure 35...
  • Page 18 Step 33. Divide all porch trim into pairs by pairing top and bottom rails by length. You should end up with 3 single bottom rails. All other should be paired up, the longest set will divide up into the first floor top rail over the steps and the bottom rail for the second floor between alcoves.
  • Page 19 Step 35. Take longest top rail and glue in front of house adding a post to the right. This is the porch opening for the porch stairs. Figure 39. Figure 39 Step 36. Continue installing porch assembly until all post and rails are installed.
  • Page 20 Step 37. Using the same process apply to the second floor two post with a bottom rail, figure 42 and continue around the side applying the side post and rails. Figure 43 Figure 42 Figure 43 Step 38. Install single long bottom rail and post Figure 44 starting assembly to the right.
  • Page 21 Step 39. Continue with porch post assembly installing last large post and upper lower rails. Figure 45 Figure 45 Step 40. Install small post and single lower rail completing porch assembly. Glue top of post to 3 floor. Figure 46...
  • Page 22 Step 41. Glue in porch steps. Figure 47. Figure 47 Step 42. Install main roof shingles. Figure 48 Figure 48 Step 43. Alcove roof shingles, start at bottom Figure 49 and work way up gluing shingles to align to the mark on the center front of each shingle and the roof shingles.
  • Page 23 Step 44. Continue as seen in figure 50 again following main roof shingles and mid line on prior installed shingle. Continue to top. Last shingle aligns to lower shingle. Figure 50 Step 45. Do the same process for the remaining three front panels. Figure 51. Figure 51...
  • Page 24 Step 46. Stain roof shingles and Install alcove roof running trim, figure 52. The house is now completed. Figure 52...
  • Page 25 Laser Dollhouse Designs. www.laserdollhouses.com laserdollhouses@aol.com...