Parts for assembly First floor base Third floor base Second floor base First floor walls and Third floor walls Second floor walls porch rails...
Page 3
Parts for assembly Entry-way roof assembly Etched plexiglas Porch roof assembly Safety rails Interior stairs Porch stair assembly Interior walk-way Top roof frame frames...
Page 4
Parts for assembly Interior doors, main, Base support rails and side doors Exterior walls wood siding Interior window frames Dormer Assemblies...
Page 5
Parts for assembly Front window roof Chimney assemblies Inside front roof frames assembly Center main roof frame Outside roof frames...
Page 6
NOTE: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also give you a chance to visualize how you want to approach the build. Materials for build; 1.
Page 7
Step 1. Locate base floor and support rails, turn base upside down and insert parts F1, F3, and F5. See figure 1 Figure 1 Step 2. Install three (3) F4 rails in the middle. Next install rail F2 by inserting into rail F3 and aligning into open groves in rails F4.
Page 8
Step 3.Install the two (2) rail F6 and rails F8 (2), F9 (2), and F10 (2). See figure 3 The base is complete turn right side up. Figure 3 Step 4. Install interior window frames, when installing place frame on interior side and align to where you see equal amount of frame on each side when viewing from the front.
Page 9
Step 5. Install Interior and exterior doors to walls. Figure 5 Figure 5 Step 6. Install first floor walls by matching walls labeled on tabs to the slots labeled on the 1 floor. see Figure 6 Figure 6...
Page 10
Step 7. Install first floor stairs before putting on main second floor. Not doing this can lead to problems installing stairs later. Figure 7 Figure 7 Step 8. Install main second floor above first floor walls by aligning open slots to tabs. See Figure 8 Figure 8...
Page 11
Step 9. Install safety rails around stairs on second floor. See figure 9 Figure 9 Step 10. Install 2 floor walls by matching walls labeled on tabs to the slots labeled on the 2 floor base. See Figure 10 Figure 10...
Page 12
Step 11. Install 2 floor stairs before putting on third floor. Not doing this can lead to problems installing stairs later. See figure 11 Figure 11 Step 12. Install 3 floor matching wall tabs to the floor slots. See Figure 12 Figure 12...
Page 13
Step 13. Install 3 floor safety rails. See figure 13 Figure 13 Step 14. Install interior frames to 3 floor walls and arched door frames. Install 3 floor walls. See Figure 14 Figure 14...
Page 14
Step 15. Install center roof panel. See figure 15 Figure 15 Step 16. Install right interior front roof panel. Make sure you seat the front panel and middle roof panel flush together. See Figure 16 Figure 16...
Page 15
Step 17. repeat step 16 for the left side. See figure 17 Figure 17 Step 18. Install front window plexiglas into wall opening, install outer wall frames. See Figure 18 Figure 18...
Page 16
Step 19. Install right gable and outer main roof panel. See figure 19 Figure 19 Step 20. Repeat set 19 for the left side. See Figure 20 Figure 20...
Page 17
Step 21. Install upper roof center panel with tab listed back to the rear of house. Panel should be flush at all corners. See figure 21 Figure 21 Step 22. Install outer dormer support frames for right and left side dormer. See Figure 22 Figure 22...
Page 20
Step 27. Install window center roof support to top of lower window extension panels. See figure 27 Figure 27 Step 28. Install window center roof panel. See Figure 28 Figure 28...
Page 21
Step 29. Install window left and right roof panels. See figure 29 Figure 29 Step 30. example of completed panels see figure 30 Figure 30...
Page 23
Step 33. Install entry-way stairs. See figure Figure 33 Step 34. Install chimney stacks. see figure 34 NOTE!!! DO NOT GLUE UNTIL ROOF IS SHINGLED…. Figure 34...
Page 24
Step 35. Install interior dormer frames. See figure 35 Figure 35 NOTE: At this point you are familiar with assembly, do not continue with rest of assembly until painting, wallpaper and lighting is done. The rest of assembly is applying shingles and outer wall frames.
Page 25
DO NOT CONTINUE UNLESS YOU HAVE HOUSE PAINTED AND GLUED. THE REST IS DONE ONCE ALL WALL PAPER, LIGHTING AND PAINT IS DONE!!!! Step 36. Using a blade cut out the small holders one section at a time of roof shingles.
Page 26
DO NOT CONTINUE UNLESS YOU HAVE HOUSE PAINTED AND GLUED. THE REST IS DONE ONCE ALL WALL PAPER, LIGHTING AND PAINT IS DONE!!!! Step 37. Using a blade cut out the small holders one section at a time of roof shingles for the window roof.
Page 27
DO NOT CONTINUE UNLESS YOU HAVE HOUSE PAINTED AND GLUED. THE REST IS DONE ONCE ALL WALL PAPER, LIGHTING AND PAINT IS DONE!!!! Step 39. Now shingle the interior main roof. Glue chimney stacks in place. See figure 40 Figure 40 Step 40.
Page 28
Step 41. Install outer panel wall frames by matching to walls, note you may need to trim some of the bottom frames due to shingles. Remove small amounts as they should fit snug. Congratulations Kristiana Tudor Completed Laser Dollhouse Designs. www.laserdollhouses.com...