Maintenance; Disposal - Honeywell SM180 Installation Instruction

Diaphragm safety valve
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 6

9. Maintenance

In accordance with DIN 1988, Part 8, the following
operations should be carried out regularly. A planned
maintenance scheme is recommended.
9.1 Inspection
To be carried out by an installation company or
the operator.
Frequency: every 6 month
Risk of scaling through hot liquid escaping from
the discharge opening.
Function check by verifying the response: While the
system is operating, briefly open the safety valve by
turning the cap. After closing the cap the valve must
close again the backed up water drain completely.
MU1H-1368GE23 R0609
GB
9.2 Maintenance
To be carried out by an installation company
Interval: once a year
Risk of scaling through hot liquid escaping from
the discharge opening.
If a malfunction is detected, a repair can be attempted
by opening and closing the cap several times. A
replacement is necessary if this action is not
successful.

10. Disposal

• Brass housing
• Spring steel adjustment spring
• High grade synthetic material security cap
• Hot water resistant elastomer diaphragm
Observe the local requirements regarding correct
waste recycling/disposal!
8
Honeywell GmbH

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sm180- 1/2za2.5Sm180- 1/2za3.0Sm180- 1/2za4.0Sm180- 1/2za6.0Sm180- 1/2za8.0Sm180- 1/2za10.0 ... Show all

Table of Contents