2. Installation and Operation
This chapter contains the installation procedures for the TRPP 5810 remote
pulser/preamplifier.
NOTE
After the TRPP 5810 has been properly installed and connected, operation is
straightforward. After power is supplied to the unit, simply make sure that the red
POWER LED illuminates.
2.1
Installing the TRPP 5810 Unit
When installing the TRPP 5810, take note of the following:
•
Install the TRPP 5810 remote pulser/preamplifier away from heat sources.
•
Use appropriate mounting methods to ensure that the unit does not fall during
operation.
After the TRPP 5810 unit is properly installed and secured, you can connect it to the
acquisition unit and to the pulser and receiver probes (see "Connecting the TRPP 5810
Unit" on page 20 and "Connecting the TRPP 5810 Unit To Bypass the Pulser
Connections" on page 21).
DMTA-20070-01EN, Rev. A, October 2014
Installation and Operation
19