Dryer Installation & Clearences - Dexter Laundry C-Series Parts & Service Manual

Commerical vended dryer
Hide thumbs Also See for C-Series:
Table of Contents

Advertisement

Dryer Installation
All commercial dryer installations must conform with local applicable local codes or in the absence of lo-
cal codes, with the National Fuel Gas Code ANSI Z223.1A-1988. Canadian installations must comply with
current standard CAN/CGA-B149(.1 or .2) Installation Code for Gas Burning Appliances or Equipment, and
local codes if applicable. The appliance, when installed, must be electrically grounded in accordance with
the National Electric Code, ANSI/NFPA No. 70-1990,or when installed in Canada, with Standard CSA C22.1
Canadian Electrical Code Part 1.
Installation Clearances:
This unit may be installed at the following alcove clearances. (millimeters)
1. Left side-
2. Right side-
3. Back-
4. Front-
5. Top-
6. Floor-
VERTICAL CLEARANCE DIMENSIONS - ALL DCBD(30/50/80)
18
Part # 8533-088-001 7/21
0"
0" *
18" (457) (Certified for 1" (25) clearance; however, 18" (457) clearance is neces-
sary behind the belt guard to allow servicing and maintenance.)
48" (1220) (to allow use of dryer)
Refer to figure labelled "Vertical Clearance Dimensions".
Certification allows 0" clearance at the top 1" (25) back from the front. However, a
1/4" (6)clearance is required to allow opening the upper service door.
A 10" (254) clearance is required from the top at all other points.
This unit may be installed upon a combustible floor.
*Units may be installed in direct contact with an adjacent dryer, providing
allowance is made for opening upper and lower service doors.
Do not obstruct the flow of combustion and ventilation air.
Maintain minimum of 1" (25) clearance between duct and combustible material.

Advertisement

Table of Contents
loading

Table of Contents