Page 1
Telescopic rod projector lift installation manual Model:GPAD76 Series GPAC76 Series Grandciew Crystal Screen Guangzhou Co.,Ltd. Guangzhou Jude Intelligent Audiovisua l Equipment Co., Ltd. No.43 S, Guomao Ave. H ualong, Panyu, Guangzhou, Guangdong, P.R.C http://www.grandviewscreen.com After-sales service T el :0 20-84899499 Thank you for purchasing this product.
Page 3
Troubleshoot This product is designed to be used for many years without failure, and many problems are caused by simple little things. If you find a problem, please check the simple fix list below. If the problem Caution persists, please contact an authorized dealer. Problem REASON Solutions...
Page 4
Components Remote control Notes 1.Working temperature: -20℃ to +70℃ 2. Battery : 2 pcs of RC2032 button battery Electric Projector Lift(GPAD76/GPAC76) Traction wire electronic 3.Requires replacement battery when given positioning setting button signal weak Battery Battery installation: Battery When remote control signal weak, please replace ①Control panel it as following: 1.Remove screw and cover on the back of remote...
Page 5
Rs485 Port Setting: USB Serial Port (COM3) Properties Bit Rate:2400; General Port Settings Driver Details Events 常规 端口设置 驱动程序 详细信息 事件 Data bit:8 bit; 960mm 1290mm Bits per second: 2400 2400 Baud Rate: Baud Rate: 位/秒(B): Odd check:N/A; Stopping position:1 数据位(D): Data bits: Data Bits:...
Page 6
Remote Localizer Installation Need to set the lower limit, opened the door of electric double mask, when finished surface layer board to smallpox, press the pause button, will the remote control on the back of the puncture needle inserted to blue Installation instructions light, the hanger into the default state, meet customer desired location, press the stop button, once again, use a needle to insert the holes at the back of the remote control lights, see the hanger walking up and down...
Page 7
Angle adjustment Installation steps 1.determine the direction of the projector and the installation position, according to the size Rotate left and right ±3° of the opening in the ceiling layer. 1.Rotate left and right Use a hex wrench to loosen the two screws on the front end. As shown by the arrow in Figure 1, the universal joint can be adjusted to the left and right by ±3°.
Page 8
5.install the decorative frame so that the decorative frame fits on the ceiling layer and the 3.After checking that the tapping screw is fixed, install the screw rod and fix it. (In order to installation is complet ed.In order to prevent the lift falling down,We suggest add 4pcs steel rods make the screw rod easier to pass through the lifter, we recommend that the end of the (Ø3-Ø4mm dia required)at the fours end corner,and place it into the ceiling as well.
Need help?
Do you have a question about the GPAC76Series and is the answer not in the manual?
Questions and answers