Connection Procedure - ABB ACS880-11 Hardware Manual

Hide thumbs Also See for ACS880-11:
Table of Contents

Advertisement

94 Electrical installation – IEC

Connection procedure

The procedure of connecting the power cables to the standard drive is described below.
For the procedure with UK gland plate (option +H358), see also ACS880-11, ACS880-31,
ACH580-31 and ACQ580-31 UK gland plate (+H358) installation guide
(3AXD50000110711
1. For frame R3: To remove the front cover, lift the cover from the bottom outwards
(1a) and then up (1b).
2
For frame R6 and R8 (IP21): Remove the cover as follows:
• Release the retaining clip with a screwdriver.
• Remove the middle front cover.
• Remove the lower front cover.
For frame R6 and R8 (IP55): Remove the covers as follows:
• Loosen the screws that attach the front cover to the frame.
• Remove the cover.
• For frame R8, disconnect the power supply wire of the auxiliary cooling fan.
[English]).
R3 – IP21
1b
1a
R3 – IP55
2
1b
1a

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents