Digital Energy
Static Transfer Switch
3.6

Starting up

3.6.1

Starting up with Switch Board

1.
Make sure that all necessary connections described in chapter 3.5.1 have been made.
2.
Make sure that the Integrated Switch placed on the Switch Board is turned into Normal position.
3.
Starting up is performed automatically after switching one of the supplying sources on. That
source will be "connected" to the load.
3.6.2

Starting up without Switch Board

1.
Make sure that all necessary connections described in chapter 3.5.2 have been made. The device
is ready to operate now.
2.
Starting up is performed automatically after switching one of supplying sources on. That source
will be "connected" to the load.