Summary of Contents for Fimer UNO-DM-6.0-TL-PLUS-US-Q
Page 1
Solar Inverter UNO-DM-6.0-TL-PLUS-US-Q Quick Installation Guide Before starting installation, download the product manual from www.fimer. com. Choose the correct country, string inverters, single phase, choose the product and proceed to the “download” section. APPLY HERE Read and follow all safety and installation instructions to avoid disabling any safety features or making the warranty invalid.
Page 2
For more detailed information regarding proper installation and use of this Lock screw position product, refer to the product manual located at www.fimer.com. The labels Power supply for rapid shutdown (RSD) terminal blocks on the inverter have the markings, main technical data and identification Locking Screw of the equipment and manufacturer.
Page 3
• All installations over 6500’ high (2,000 meters) must be assessed by holes to mount the bracket (see figure detail A) FIMER Technical Sales to determine the proper datasheet derating • Secure the bracket to the wall or frame • If needed, make conduit cutouts in the wiring box chassis, before the wiring box is put on the wall •...
Page 4
NEC and is the responsibility of the installer. A configuration program that can help to correctly size the photovoltaic system is available on at http://stringsizer.fimer.com/ All power conductors will be inserter in spring clamp terminals.
Page 5
8. AC Output connection 9. User Interface LEDs, in various combinations, may show the status conditions or perform WARNING – To prevent electrocution hazards, open and lock complex actions to be explored by consulting the product manual. out the external AC disconnect switch before connecting the AC conductors, and any time the AC wiring box cover is to be removed.
Page 6
Identify and select your own (home) wireless network from all those shown firmware updates in the download area of the website www.fimer.com in the SSID field (you can carry out a new search of the networks that or at https://registration.solar.fimer.com (instructions for registering on...
Page 7
The AFD performs a self-test when the system is started: webserver). In addition it is possible to use the mobile App ‘FIMER • If the self-test results are OK, the inverter will continue to AC grid ability Energy Viewer for solar plants’...
Page 8
This startup may occur on a daily basis or when the inverter restarts after an abnormal grid event has ended. READ THE MANUAL – Refer to the dedicaterd application note in the FIMER Solar website for more details about the grid support functions. FIMER_UNO-DM-6.0-TL-PLUS-US-QU_Quick Installation Guide_EN_RevD 26-04-2021...