Download Print this page

Ideal Heating IMAX XTRA 2 Quick Start Manual

Hide thumbs Also See for IMAX XTRA 2:

Advertisement

Quick Links

H E A T I N G
WELCOME TO
IMAX XTRA 2
QUICK START GUIDE
If there is a fault then
Actual hot water
the English language
temperature is shown
description will be
here
shown here
Target
hot water
Loss of flame in operation 128-253"
temperature is
shown here
TARGET
ACTUAL
75°
75°
TARGET
ACTUAL
The current
status of
Hot Water
hot water
Hot Water
operation is
No Demand
shown here
Off
MENU
If an outside
MENU
100%
sensor is
connected
100%
then the
outside
temperature is
shown here
Whether the burner is lit
If the burner is lit then
is shown here
the modulation level is
shown here
0% indicates the boiler
is at operating at
minimum rate (max.
modulation)
100% indicates that the
For any circuit not in use the boiler will
boiler is at operating
clearly display Off.
maximum rate
Three dots are shown under the
heating icon to provide access to the
current state of up to three circuits.
Tap the dots to change the display
In the event of a fault occurring please tap the red banner to review and
information.
01482 498376
TECHNICAL HELPLINE:
idealheating.com
227884 A01
Target central heating
flow temperature is
shown here
Actual central
heating flow
temperature is
shown here
TARGET
ACTUAL
75°
75°
TARGET
ACTUAL
The current
status of
Heating
central heating
Heating
operation is
Demand On
shown here
Demand On
1
2
3
Switched Live Control
The method of
boiler control
Burner Stabilisation
Switched Live Control
is shown here
(Switched Live
Burner Stabilisation
or 0-10V or
Opentherm or
Internal Boiler
Control)
The current operating
state of the boiler is
shown here (Standby
or Pre-Purge or Ignition
or Burner On or
Post-Purge or Pump
Overrun)
reset as required
welcome to our ideology
PRECONFIGURATION - Imax Xtra 2 is preconfigured with common controls
setups to make your installation quick and easy.
Assuming all necessary electrical and hydraulic connections have been made, to
achieve heat on from a switched live demand apply Basic Pre-Config.
The HMI touchscreen has a protective film
overlay fitted which needs to be removed
before use.
Safely and responsibly dispose of the protective
film overlay.
When the boiler is powered up for the first
time the screen on the right will be shown.
To accept the default configuration press Basic
Pre-Config.
The boiler will complete the configuration
automatically and proceed to the home screen
as seen on the left.
Default Configuration:
Switched Live Control
1x Heating Circuit controlled by SL1 CH Pump
available
1x DHW circuit controlled by SL2 DHW Pump
available
This configuration is shown in the basic
diagram to the right. Although two circuits are
provided in the configuration they do not have
to be wired if they are not required.
(please note the diagram to the right is shown for information only,
it will not be seen when using the Basic Pre-Config option)
To remove the boiler casing refer to installation manual section 3.7.
For installer electrical connection diagrams refer to installation manual from section 2.10.
To adjust flow temperature setpoint after configuration refer to installation manual section 2.37.
To check maximum, minimum or variable rate after configuration refer to installation manual section 2.32.
NOTE - If Basic Pre-Config is chosen and the boiler is to be reconfigured at a later date please complete a factory reset
before reconfiguration (detailed internal boiler control instruction are available online at idealheating.com)
After 5 seconds
Configuration Type
Basic Pre-Config
Assisted
CH Pump & DHW Pump
SELECT
1/3

Advertisement

loading
Need help?

Need help?

Do you have a question about the IMAX XTRA 2 and is the answer not in the manual?

Questions and answers