10. Commissioning and system test

When the alarm system is properly installed and all connection work has been
completed successfully, commissioning can be continued. For this purpose,
proceed as follows:
• Activate the power source to supply the alarm system with operating voltage.
• After switching on operating voltage, a short signal sound is issued.
The alarm system now requires approx. 90 seconds for initialisation. During
this initialisation, the status LED "EXIT" flashes quickly. After the end of the
initialisation stage, the status LED "EXIT" goes out.
• Set the "mode selection switch" to "AWAY" (since this switch position arms
both alarm zones).
The exit delay (approx. 60 seconds) commences now. During the exit delay,
the status LED "EXIT" flashes quickly. After the end of the exit delay, a short
signal sounds and then the status LED "EXIT" flashes slowly.
• The alarm system is now armed.
The status LED "EXIT" is lit permanently when a sensor has trigge-
red in the alarm zone (this applies if the mode selection switch is set
to "HOME" or "AWAY"). In this case, check correct connection of
the sensors and whether or not the sensor is activated. Verify, e.g.,
whether windows and doors are closed and thus the door/window
detectors connected to them are not activated.
45