Selecting An Installation Site - Mitsubishi Electric M-SERIES Installation Manual

Hide thumbs Also See for M-SERIES:
Table of Contents

Advertisement

Available languages

Available languages

SVZ-KP12,18, 24, 30, 36NA

5. Selecting an installation site

• Avoid locations exposed to outside air.
• Select a location free of obstructions to the airflow in and out of the unit.
• Avoid locations exposed to steam or vapor.
• Avoid locations where combustible gas may leak, settle, or be generated.
• Avoid installation near machines emitting high-frequency waves (high frequency welders, etc.).
• Avoid locations where the airflow is directed at a fire alarm sensor. (Hot air could trigger the alarm during
operation.)
• Avoid places where acidic solutions are frequently used.
• Avoid places where sulphur-based or other sprays are commonly used.
• When the air handler is installed in the horizontal position please install a drain pan under entire cabinet.
• Install sufficient thermal insulation to prevent condensation from forming on the outlet and inlet ducts.
Specifications are subject to change without notice.
15
© 2020 Mitsubishi Electric US, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents