10. Mount positions

10.1. Vertical installations

The air handler must be supported on the bottom only and set on a solid floor with a return plenum below or
field supplied supporting frame or plenum. Securely attach the air handler to the floor or supporting frame or
plenum.
2
3
4
The parts are required to meet the latest RoHS directive.

10.2. Horizontal right installations

Refer to section 10.3. Step 1 to 3 & 8 for removing the entire coil assembly from the air handler cabinet.
This will require removing the Filter, Blower and Coil Panels along with the bracket(s) that secures the coil
assembly. Be sure to to disconnect the waterproof connector in order to remove the coil from the cabinet.
Once the coil is removed, the two clear plastic tubes included in the accessory bag will need to be attached
to the top drain pan. First, remove the lower rubber plugs in the top drain pan. Next, install the clear plastic
tubes which are included in the accessory bag. Ensure the plastic tubes drain into the pan. Also, be sure
the clear plastic tubes do not have any restriction. Cutting of the plastic tube is required, please refer to the
table for length. Finally, secure the clear plastic tubes to the top drain pan per Detail A then to the metal
brackets supporting the coil to the top drain pan with the provided plastic ties as shown.
© 2020 Mitsubishi Electric US, Inc.
SVZ-KP12,18, 24, 30, 36NA
5
6
7
1
① Plenum
8
9
10
① Plugs
20