Component Service Information - Hoshizaki DCM-300BAH Service Manual

Hide thumbs Also See for DCM-300BAH:
Table of Contents

Advertisement

B. Component Service Information
• When replacing a component listed below, see the notes to help ensure proper
operation.
• When replacing evaporator assembly and water circuit components, make sure
there are no water leaks after the repair is complete.
• Seal bolts must be replaced once removed because seal material is one-time use
only. If new seal bolts do not have preapplied threadlocker, apply Loctite 243 or
equivalent threadlocker to seal bolt threads. Tighten to the torque values listed
below.
Torque for DCM models: 11.1 ft-lb/15 N·m
Component
Compressor
Fan Motor
Thermostatic
Expansion Valve
Upper and Lower
Bearings
Evaporator
Gear Motor
Install a new drier, start capacitor, and start relay.
Install a new capacitor.
• Attach the thermostatic expansion valve bulb to the suction line in the same
location as the previous bulb.
• The bulb should be between the 10 and 2 o'clock positions on the tube.
• Secure the bulb with the clamp and holder, then insulate it.
• Inspect the upper bearing for wear. See "IV.C.1. Upper Bearing Wear Check."
Replace if necessary.
• When replacing the upper bearing it is advised to also change the lower bearing at
the same time.
• Install a new drier.
• Inspect the mechanical seal and O-ring prior to installing the new evaporator.
If worn, cracked, or scratched, the mechanical seal should also be replaced.
Install a new gear motor capacitor.
NOTICE
Notes
46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents