Bin Control Check - Hoshizaki DCM-300BAH Service Manual

Hide thumbs Also See for DCM-300BAH:
Table of Contents

Advertisement

D. Bin Control Check
When the actuator paddle is not engaged, BC circuit (CB K8 #3 (GY) and CB K8 #4 (GY))
is closed and the appliance produces ice. When ice fills the chute and engages the
actuator paddle, BC opens.
NOTICE! Do not place S1 dip switch 7 or S1 dip switch 8 out of the factory default
position. These dip switches must be left in the factory default position or the
appliance will not operate correctly. For details, see "III.C.1. Default Dip Switch
Settings."
• 2A4296-01: Dip switch 8 on; CB shuts down the appliance within 6 to 10 seconds.
• 2A8054-01 and 2A9093-01: Dip switch 8 and 9 on; CB starts the bin control
90-60 shutdown delay sequence after dip switch 8 bin control delay timer (6 to 10 sec.)
terminates. See "II.A.2.B. 2A8054-01 and 2A9093-01 90/60 sec. Shutdown."
1) Move the control switch to the "OFF" position.
2) Remove the front and top panels.
3) Remove the storage bin cover. If necessary, dispense ice or remove ice manually so
that the BC actuator paddle is not engaged.
IMPORTANT! Appliance will not start unless the safety switch is engaged.
WARNING! Keep hands, hair, and loose clothing clear of the agitator rotating
inside of the storage bin.
4) Move the power switch to the "OFF" position.
5) Turn off the power supply.
6) Disconnect BC connector from the back of the control box.
7) Check for continuity across BC proximity switch. If BC actuator is not engaged and BC
proximity switch is open, replace BC proximity switch.
8) Press and hold BC actuator paddle. While BC actuator is engaged, check for continuity
across BC proximity switch. If BC actuator is engaged and BC proximity switch is
closed, replace BC proximity switch.
9) Disengage BC actuator paddle.
10) Reconnect BC connector. Remove the control box cover.
11) Turn on the power supply. Move the power switch to the "ON" position.
12) Move the control switch to the "ICE" position.
13) Engage the safety switch to start the automatic icemaking process.
14) Make sure the "GM" LED is on. There is a delay of at least 5 seconds before the "GM"
LED turns on after power-up. After the "GM" LED turns on, press the "SERVICE" button
on CB to bypass the ice purge timer (1-min. or 5-min.). WARNING! Risk of electric
shock. Care should be taken not to touch live terminals. "COMP" LED turns on.
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents