FusionModule500 Smart Mini Data Center
User Manual
3.
4.
Issue 01 (2020-11-30)
Figure 4-43 Installing a guide rail
Install a filler panel for guide rails. Fasten the M6 screws to install the filler
panel for the guide rails.
Figure 4-44 Installing a filler panel for guide rails
Install the cage nuts that secure the IVS1800. The cage nut installation
locations are the first and sixth holes along the guide rails, as shown in the
following figure.
Copyright © Huawei Technologies Co., Ltd.
4 Installation Guide