Installationrequirements - Ispring WCS45KG Installation Instructions & Operating Manual

Whole house central softener
Table of Contents

Advertisement

Equipment Installation Conditions
 The installation location should be well-ventilated and protected against wind and rain. Avoid
direct sunlight and radiation from any heat sources.
 This equipment is required to be installed indoors. If it needs to be installed outdoors, heat
preservation measures must be taken for the body and pipes, including frost-proof, sun-proof, and
waterproofing measures and insulation.
 The inlet water must meet the water quality standards of municipal tap water.
 The sewage pipe should remain open at all times.
 If the equipment is installed indoors, the installation equipment must be equipped with water
leakage protection.
 120V/60Hz single-phase AC power must be used;alternative power supplies are strictly prohibited.
The socket must also have a reliable ground wire.
 The product's power supply and plug must be installed in a wall position higher than 500 mm
above the ground and equipped with proper grounding, leakage protection, and waterproof devices.
 The installation location should be level, and the ground bearing capacity should be greater than
2
300 kg/m
.
Installation Precautions
 This equipment should never be tilted or placed horizontally during transportation, installation, or
use.
 Ensure there is proper space around the device and do not apply any external force to the device or
its connecting pipes.
 Do not install this product near corrosive substances or gases, which may lead to corrosion or
damage.
 Do not place flammable items on or near the product.
 All inlet and outlet pipes are recommended for use with water pipes and fittings that meet the
appropriate standards of domestic drinking water. The connection of water pipes and circuits should
comply with national or industry standards, and the pipe connections should comply with relevant
federal installation regulations.
 Pay attention to the height and placement angle of the pipeline when it is connected. After the
pipeline is appropriately connected, there should be no evidence of stress, so as to avoid damage to
the water pipe or the product due to long-term use.
 The overflow pipe and the sewage pipe must be connected to the sewer separately, and the two
must not be combined and then transferred to the sewer. The sewer drainage must be unobstructed,
and there must be an air gap between the sewage pipe and sewage to prevent the sewage from
flowing back into the system due to negative pressure.
 The water pressure is to be 20 psi - 50 psi.If the water inlet pressure is higher than 50 psi, a
pressure reducing valve must be installed at the water inlet pipe of the water purifier. If the water
Page 9
Installation Requirements
www.123filter.com
| (678) 261-7611 |
support@123filter.com

Advertisement

Table of Contents
loading

Table of Contents