8.3 Piping selection
When several modules are connected, the installation sequence of ODU 1-4 shall meet the following
requirement: ODU 4 ≥ ODU 3 ≥ ODU 2 ≥ ODU 1.
(1) Piping "A"of ODU and ODU branch
Choose pipe diameter according to the ODU capacity connected to the upstream of ODU branch.
Basic module (single module system)
GMV-224WM/G-X
GMV-280WM/G-X
GMV-335WM/G-X
GMV-400WM/G-X
GMV-450WM/G-X
GMV-504WM/G-X
GMV-560WM/G-X
GMV-615WM/G-X
GMV-680WM/G-X
(2) Piping "B" of the ODU branches and piping "C" of the ODU and IDU branches
Make a choice according to the sum of all the connected ODU capacity of upstream ODU branch.
Total rated capacity of upstream module Q
(kW)
Q≤22.4
22.4<Q≤30.0
30.0<Q≤40.0
40.0<Q≤45.0
45.0<Q≤68.0
68.0<Q≤96.0
96.0<Q≤135.0
135.0<Q≤186.0
186.0<Q
124
Gas pipe (mm)
Φ19.05
Φ22.2
Φ25.4
Φ25.4
Φ28.6
Φ28.6
Φ28.6
Φ28.6
Φ28.6
Piping size among ODU modular branches
Gas pipe (mm)
Φ19.05
Φ22.2
Φ25.4
Φ28.6
Φ28.6
Φ31.8
Φ38.1
Φ41.3
Φ44.5
Liquid pipe (mm)
Φ9.52
Φ9.52
Φ12.7
Φ12.7
Φ12.7
Φ15.9
Φ15.9
Φ15.9
Φ15.9
Liquid pipe (mm)
Φ9.52
Φ9.52
Φ12.7
Φ12.7
Φ15.9
Φ19.05
Φ19.05
Φ19.05
Φ22.2