Removal and installation of chair control (8 pages)
Summary of Contents for Steelcase Huddleboard
Page 1
Hanger Hooks, Ledge Grabbers, Flip Chart Pegs, Marker Grip MOBILE EASEL If you have a problem, question, or request, call your local dealer, or Steelcase Line 1 at 888.STEELCASE (888.783.3522) for immediate action by people who want to help you.
Page 2
Maintenance Push marker Clean with warm soapy water, into grip. wipe with sponge and allow to NOTE: Huddleboard air dry. boards are not designed Page 2 of 4 to be ganged together. 939504755 Rev F...
Page 3
® PANEL/STRUCTURAL (DRYWALL) TRAY Tray Assembly and Installation Align and mount brackets (A) to respective panel or structural wall (drywall). NOTE: For Architectural mountings, mount brackets (A) 6” inboard to the end of tray location. For all other panel systems, mount brackets at desired height.
Page 4
Mobile Easel Assembly ® Step 1 Remove easel (A) from box and press casters (B) into base (C) (a rubber mallet may be necessary). NOTE: If locking caster option is included, install MOBILE EASEL locking casters in the two front positions. Board Storage Capacity Remove tray (G) from sub-board (H).
Need help?
Do you have a question about the Huddleboard and is the answer not in the manual?
Questions and answers