Steelcase Huddleboard Manual

Steelcase Huddleboard Manual

Advertisement

Quick Links

®
Hanger Hooks, Ledge Grabbers, Flip Chart Pegs, Marker Grip
If you have a problem, question, or request, call
your local dealer, or Steelcase Line 1 at
888.STEELCASE (888.783.3522)
for immediate action by people who want to help you.
(Outside the U.S.A., Canada, Mexico, Puerto Rico,
and the U.S. Virgin Islands, call: 1.616.247.2500)
Or visit our website: www.steelcase.com
©
2012 Steelcase Inc.
Grand Rapids, MI 49501
U.S.A.
Printed in U.S.A.
PANEL/STRUCTURAL TRAY
Huddleboard
Products
939504755 Rev F
Page 1 of 4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Huddleboard and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Steelcase Huddleboard

  • Page 1 Hanger Hooks, Ledge Grabbers, Flip Chart Pegs, Marker Grip MOBILE EASEL If you have a problem, question, or request, call your local dealer, or Steelcase Line 1 at 888.STEELCASE (888.783.3522) for immediate action by people who want to help you.
  • Page 2 Maintenance Push marker Clean with warm soapy water, into grip. wipe with sponge and allow to NOTE: Huddleboard air dry. boards are not designed Page 2 of 4 to be ganged together. 939504755 Rev F...
  • Page 3 ® PANEL/STRUCTURAL (DRYWALL) TRAY Tray Assembly and Installation Align and mount brackets (A) to respective panel or structural wall (drywall). NOTE: For Architectural mountings, mount brackets (A) 6” inboard to the end of tray location. For all other panel systems, mount brackets at desired height.
  • Page 4 Mobile Easel Assembly ® Step 1 Remove easel (A) from box and press casters (B) into base (C) (a rubber mallet may be necessary). NOTE: If locking caster option is included, install MOBILE EASEL locking casters in the two front positions. Board Storage Capacity Remove tray (G) from sub-board (H).

Table of Contents