Mounting The Rails (Single Bar) - Warmup HTR-4ROPO Installation Manual

Heated towel rail
Table of Contents

Advertisement

Step 3 - Mounting the Rail
Single Bar Rails
Components List
Wall mounts
(Round Rails)
4
Mounting
Screws
x 3
1
Measure and record the
resistance of the towel rails
in the "Resistance Before"
column of the control card,
supplied as part of this
installation guide.
Stop installation immediately
and contact Warmup if its
resistance falls outside the
values set out in the resistance
table.
12
1A
Wall mounts
(Square Rails)
x 2
5
Hex key
x 1
1B
M5 x 8
Grub screws
x 2
x 2
2
Place the wall mounts (1A
or 1B) into the rail. Use a
tape measure to measure the
distance between the screw
holes on the wall mounts.
Also measure the distance
between the screw and power
supply cable holes.
2
3
Wall plugs
x 3

Advertisement

Table of Contents
loading

Table of Contents