Step 3 - Mounting the Rail
Single Bar Rails
Components List
Wall mounts
(Round Rails)
4
Mounting
Screws
x 3
1
•
Measure and record the
resistance of the towel rails
in the "Resistance Before"
column of the control card,
supplied as part of this
installation guide.
•
Stop installation immediately
and contact Warmup if its
resistance falls outside the
values set out in the resistance
table.
12
1A
Wall mounts
(Square Rails)
x 2
5
Hex key
x 1
1B
M5 x 8
Grub screws
x 2
x 2
2
Place the wall mounts (1A
•
or 1B) into the rail. Use a
tape measure to measure the
distance between the screw
holes on the wall mounts.
•
Also measure the distance
between the screw and power
supply cable holes.
2
3
Wall plugs
x 3