1YSA160045-EN - Rev. 5
C.5.

Commissioning

C.5.1.

General procedures

When commissioning, all operations must be carried out by suitable qualified
customer personnel with in-depth knowledge of the apparatus and the installation
itself.
It is not recommended to open wiAutoLink under charge using a common hookstick,
as it could cause an arc that might damage the personnel or the equipment. The
wiAutoLink has horns to be used with a load break tool.
25 / 33