Un-Installation Procedure - L&T Electrical & Automation 1 Phase DIN Rail Meter User Manual

Table of Contents

Advertisement

DIMENSION
S
All dimensions are in mm
INSTALLATION PROCEDURE
STEP 1.
PULL
* For terminal cover sealing, wire used should be of maximum 0.8mm diameter
 Warning: Terminal cover has to be used for operator protection. As soon as the connections are
made the terminals has to be covered by terminal cover.

UN-INSTALLATION PROCEDURE

*** Note:
1) Before installing and uninstalling the meter make sure that the Power supply to the meter is switched
off.
2) Remove all the connections to the meter.
3) PULL the locking clips with the help of a screwdriver by inserting it in slot provided in the clip.
STEP 2.
PULL
PULL***
STEP 3.
PULL***
STEP 4.
PRESS
PRESS
Page 7 of 8

Advertisement

Table of Contents
loading

Table of Contents