Grundfos SA-SPM6 Installation And Operation Instructions Manual

Grundfos SA-SPM6 Installation And Operation Instructions Manual

Control box

Advertisement

GRUNDFOS INSTRUCTIONS
SA-SPM6
Control box
Installation and operating instructions

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SA-SPM6 and is the answer not in the manual?

Questions and answers

Summary of Contents for Grundfos SA-SPM6

  • Page 1 GRUNDFOS INSTRUCTIONS SA-SPM6 Control box Installation and operating instructions...
  • Page 2: Table Of Contents

    Grundfos are subject to the warranty Wiring diagrams provided by the manufacturer of said products Disposal and not by Grundfos' warranty. Grundfos will not be liable for damage or wear to products caused by abnormal operating conditions, accident, Warning...
  • Page 3: Symbols Used In This Document

    3. Installation Warning Warning The control box panel shall be The SA-SPM6 Grundfos permanently grounded in Submersible Pump Control Box accordance with the National shall be installed per local, state, Electrical Code, local codes and and federal codes in accordance regulations.
  • Page 4: Operation And Maintenance

    5. Troubleshooting Switch power supply to this circuit OFF at the power supply panel (not in this control box) before working on or around the control box, Warning pipes, cable, pump or motor. Ensure that power supply is turned OFF prior to electrical installation. 3.2.3 Protection 1.
  • Page 5: Wiring Diagrams

    Fused disconnect switch Control box Black Use dotted line for Yellow 115 V operation Green Well seal Fig. 1 Overview of single-phase wiring for Grundfos 3-wire control boxes Orange Capacitor Blue Relay Green Green Black Yellow Common Start Line Fig.
  • Page 6 Start capacitor Orange Relay capacitor L2 YEL BLK RED SW Yellow Overload Motor Line power ground lead ground lead Fig. 3 Wiring for 1.5 Hp models (Standard) Line contactor Coil Coil Orange Start capacitor Relay capacitor Pressure switch L2 YEL BLK RED SW Blue Main Start...
  • Page 7 Start capacitor Orange Relay capacitor YEL BLK RED SW Yellow Start Main overload overload Fig. 5 Wiring for 2 and 3 Hp models (Standard) Line contactor Coil Coil Orange Start capacitor Relay capacitor Pressure switch YEL BLK RED SW Blue Start Main overload...
  • Page 8 Start capacitor capacitor Orange Relay capacitor YEL BLK RED SW Yellow Start Main overload overload Fig. 7 Wiring for 5 Hp models (Standard) Line Orange contactor Start Coil Coil capacitor capacitor Relay capacitor Pressure switch L2 YEL BLK RED SW Blue Main Start...
  • Page 9 This product or parts of it must be disposed of in an environmentally sound way: 1. Use the public or private waste collection service. 2. If this is not possible, contact the nearest Grundfos company or service workshop. Subject to alterations.
  • Page 11 Grundfos Kansas City Grundfos Canada Grundfos México 17100 West 118th Terrace 2941 Brighton Road Boulevard TLC No. 15 Olathe, Kansas 66061 Oakville, Ontario L6H 6C9 Canada Parque Industrial Stiva Aeropuerto Phone: +1-913-227-3400 Phone: +1-905 829 9533 C.P. 66600 Apodaca, N.L. Mexico...
  • Page 12 L-CB-TL-002 98614859 0114 ECM: 1127624 www.grundfos.com...

Table of Contents