Figure 12: Nut Tightening Order; Figure 13: Tail Fin Attachment - Bergey Tilt Tower Installation Manual

Table of Contents

Advertisement

Figure 12: Nut Tightening Order

Step 6:
Attach the spinner (nose cone) using the three M5 bolts and lock washers provided, as
shown in Figure 11. We recommend applying Loctite to the bolt threads prior to as-
sembly.
Tail Fin Fasteners

Figure 13: Tail Fin Attachment

Step 7:
Bolt the tail fin to the tail boom using the eight M5 bolts and lock-washers provided, as
shown in Figure 13. We recommend applying Loctite to the bolt threads prior to as-
sembly.
Step 8:
Place the tail boom on the rear of the turbine powerhead and insert the 1/2" tail pivot pin
from the top. If the parts are aligned properly the pin should insert easily. Do not use a
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tilt tower 60'Tilt tower 80'Tilt tower 100'

Table of Contents