Bergey Tilt Tower Installation Manual page 19

Table of Contents

Advertisement

WARNING: Do not work under or near the tower while it is being lifted. Do not
work under or near the tower when it is off the ground, unless it is
resting on blocks or is fully guyed.
Step 15:
Lower the tower and make any necessary adjustments to the guy wires or anchors.
Roll out the guy wires that will be attached to the back anchor located under the tower
pole. Attach the set of back guy wires to the back anchor. The back wires should be
walked over to the side anchors to get an approximate length prior to attachment.
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tilt tower 60'Tilt tower 80'Tilt tower 100'

Table of Contents