Installation; Receiving The Product; Dimensions And Weights; Installation Inside The Box - Riello BAG3 AP Instructions For The Installer And For Technical Assistance

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

2 INSTALLATION

2.1 Receiving the product

The BAG
3
(1) is supplied in one package, protected by cardboard
packaging (2) inside of which there is a plastic envelope con-
taining:
− Plumbing connection ramps (3) towards the heat gen-
erator
− Brackets (4) and wiring case (5)
− Instruction manual (6)
1
2
9
The packing material is to be conserved and not discarded
as it could be potentially dangerous.
3
6
4
5
26

2.2 Dimensions and weights

L
3 AP
L
P
H
Net weight of box (*)
Net weight of appliance
18
(*) The box is supplied separately, on request as an accessory .

2.3 Installation inside the box

9
Before installing BAG
3
inside the box, check that all the con-
nectors are correctly tightened.
9
If the insulation kit is to be fi tted, supplied as an accessory
upon request, ensure that the hydraulic module inside the
box is correctly positioned.
9
A suction pipe is inserted inside the mixing bottle and this
must not under any circumstances be removed. Do not re-
move the closing plug (1) of the suction pipe, located on the
top connector of the mixing bottle, until instructions to do
this are given.
1
H
P
3
BAG
2 AP
AP
400
160
720
8
15
12

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Bag3 2 apBag3 3 ap200822772008228020082282

Table of Contents