Technical Data; Plumbing Connections - Riello BAG3 AP Instructions For The Installer And For Technical Assistance

Table of Contents

Advertisement

Available languages

Available languages

1.6 Technical data

DESCRIPTION
Electrical power supply
Maximum absorbed power
Power absorbed by each individual circulation unit - min/max
Electrical power of each individual circulation unit - min/max
Operating t
Electrical protection level with wall mounted installation
Electrical protection level with "built-in" installation
Maximum pressure
Ambient temperature required for installation

1.7 Plumbing connections

The characteristics of the plumbing connections are as follows:
3
3
BAG
3 AP
170
170
115
80
Ec
Uc
Rd3
Md2
Rd1
Rd2
Md1
50
60 60 60 60 60
400
Ec Boiler inlet (Ø 3/4")
Uc Boiler outlet (Ø 3/4")
Md1 Direct system delivery 1 (Ø 3/4")
Md2 Direct system delivery 2 (Ø 3/4")
Md3 Direct system delivery 3 (Ø 3/4")
Rd1
Direct system return 1 (Ø 3/4")
Rd2
Direct system return 2 (Ø 3/4")
Rd3
Direct system return 3 (Ø 3/4")
9
The maximum length of the plumbing connections between the boiler and the BAG
3
BAG
2 AP
170
170
115
80
Ec
Uc
Rd1
Md3
Rd2
Md1
50
50
60
120
60
400
UM
3 AP
V~Hz
W
158
W
A
°C
-
-
bar
°C
3
BAG
AP
170
115
Ec
Md2
Rd1
Md1
110
50
180
400
21
3
BAG
2 AP
230(±10%)~50
105
6 / 52
0,07 / 0,49
20 ÷ 90
IP10D
IPX4D
3
greater than 4
170
80
Uc
170
3
must not exceed 15 m.
GENERAL
AP
53
75
85
50
110
160

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Bag3 2 apBag3 3 ap200822772008228020082282

Table of Contents