Riello FCU 09 N Instructions For The Installer And The Technical Service Centre page 11

Hide thumbs Also See for FCU 09 N:
Table of Contents

Advertisement

8.2 Comando CP - Comfort/r
Modello 09 con resistenza 1 stadio
T
S
R
N
R S
QUADRO RESISTENZA / ELECTRICAL HEATING SECTION BOARD
A TRATTEGGIO SONO EVIDENZIATI I COLLEGAMENTI DA EFFETTUARSI A CURA DELL'INSTALLATORE
DASHED LINES SHOW THE CONNECTIONS TO BE CARRIED OUT BY THE INSTALLER
TUTTE LE LINEE DEVONO ESSERE PROTETTE ALL'ORIGINE A CURA DELL'INSTALLATORE
ALL LINES MUST BE PROTECTED AT THE ORIGIN BY THE INSTALLER
PARAMETRI DEL CONTROLLORE DA MODIFICARE RISPETTO ALLE IMPOSTAZIONI DI DEFAULT (CONSULTARE ANCHE IL MANUALE ISTRUZIONI DEL TERMOSTATO
CONTROL PANEL PARAMETERS TO BE MODIFIED WITH RESPECT TO THE DEFAULT SETTING
It
T
KMR1
6
7
TS
TS
P01 = 0
P03 = 3
P04 = 3
P05 = 4
8.2 CP - Comfort/r controller
Model 09 with 1 step electric heater
CP - Comfort/R
L
N
4
5 6
7 8
3
9
10
11
Nero / Black = Alta vel. / High speed
1
Blu / Blue = Media vel. / Medium speed
2
Rosso / Red = Bassa vel. / Low speed
3
Bianco / White = Neutro / Neutral
N
Giallo-Verde / Yellow-Green = Terra / ground
ALSO CONSULT THE INSTRUCTION MANUAL OF THE CONTROL PANEL)
(
P06 = 4
P23 = 99
P24 = 0
C10 = 0
11
EN
12
13
1415
16
M
1 ~
COLLEGAMENTI EFFETTUATI IN FABBRICA
FACTORY CONNECTIONS
FCU N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents