3.2. Installation
When installing the DRYPOINT
flows from left → right, the purge air outlet (2) faces forward.
•
For maintenance and servicing, we recommend installing a bypass line (1). Take into account that there should be around
30 cm space for the operation of the control unit.
•
Install the supplied long nipples and the check valve in the outlet assembly of the membrane dryer (mount in flow
direction, see arrow on check valve).
•
The purge air must flow freely from the section covered by the screen (2).
•
The room in which the unit and the accessory equipment are installed must not house units that might release chemical
substances.
•
The unit must be installed in a room that is protected against frost. The ambient temperature as well as the compressed
air temperature must be between +35 and +122 °F.
•
Before installing the unit, thoroughly clean the existing pipelines and devices. (e.g. by blowing out).
•
Seal all threads with Teflon tape → do not use liquid sealants.
•
Install the unit so that the filter can be changed easily without causing damage to the drying system.