Merging units require careful handling.
1.
Examine the delivered products to ensure that they have not been damaged
during the transport.
2.
Remove the transport packaging carefully without force.
3.
Attach the protective film (supplied with the merging unit) on the top side of the
unit for the installation phase.
Before connecting the auxiliary power, remove the protective
film from top of the merging unit.
The cardboard packaging material is 100% recyclable.

Inspecting product and delivery items

Identifying product

1.
Locate the merging unit's order number from the label on top of the plug-in unit.
2.
Compare the merging unit's order number with the ordering information to
verify that the received product is correct.

Checking delivery items

Check that all items are included in the delivery in accordance with the delivery
documents.

Inspecting product

Merging units require careful handling before installation on site.
Check the merging unit to see if any damage occurred during transportation.