GEM Q30 Operating Instructions Manual page 14

Pneumatically operated pinch valve
Hide thumbs Also See for Q30:
Table of Contents

Advertisement

10 Inspection and maintenance
10.5 Installing the compressor
Risk of crushing due to the compressor
shutting down!
▶ Severe injury due to crushing or shear-
ing of the fingers.
Ensure that the actuator remains in the
open position while replacing the com-
pressor.
Do not reach into the tube crushing
area.
1. Remove the tube (see "Removing the tube", page 13).
2. Disassemble the tube holder (see "Disassembling the tube
holder", page 13).
3. Disassemble the compressor (see "Disassembling the
compressor", page 13).
4. Insert the compressor 2 and press upwards until the com-
pressor engages.
5. Move the actuator A to the open position.
10.6 Assembling the tube holder
1. Disassemble the tube holder (see "Disassembling the tube
holder", page 13).
2. Insert the tube holder 1.
3. Tighten the fixing screw c using a hex driver.
GEMÜ Q30
CAUTION
2
1
c
10.7 Inserting the tube
1. Remove the tube (see "Removing the tube", page 13).
2. Insert the tube.
3. Close the tube holder 1.
4. Turn the locking ring b by 90° in the direction of the arrow.
ð The word "locked" can be read on the tube holder.
5. With the valve fully assembled, check the function and
tightness.
14 / 17
1
b
www.gemu-group.com

Advertisement

Table of Contents
loading

Table of Contents