Breville VCF126 Manual page 9

Barista max espresso machine with integrated grinder
Table of Contents

Advertisement

BEFORE FIRST USE OF THE BARISTA MAX
Step 6. Preparing to Prime Machine
Important: This priming step must be
completed prior to first use.
• Fill Water Reservoir
- Open the Lid and lift upwards using the
Handle inside.
- Fill with cold water from the tap.
- Insert the Water Reservoir into position
& close the Lid.
MAX
2.8L
1L
MIN
Note: Make sure that the Water Reservoir
is clean & free of any debris, as any fine
particles can block the water flow.
• Power
- Ensure that the Steam
DIAL is in the vertical position.
- Insert the Power Plug into a 230-240V
AC power outlet & switch the power on.
- Press the
BUTTON to turn on the
machine.
- The
LIGHT will illuminate & pulse to
indicate the Thermoblock is heating up.
- The GRINDER LIGHT will be fully
illuminated from turn on.
- When the
, EXTRACTION
BUTTONS & DIAL LIGHTS are all
fully illuminated, the machine is in the
READY state for EXTRACTION & DIAL
features.
READY
MAX
2.8L
1L
MIN
& Hot Water
• Insert Group Handle
- Insert the Two Cup Filter Basket in the
Group Handle.
- Align the Group Handle with the
'INSERT' position located on the left of
the Group Head.
- Insert the Group Handle flat against
the Group Head, then turn the Group
Handle right all the way to the centre
position.
INSERT
2.TURN
1. ALIGN
& INSERT
Note: Turning the Group Handle to the
centre position might be tight for the first
few uses.
Step 7. Prime Espresso Machine
- Press the
BUTTON & water
should start flowing from the Group
Head.
- Allow water to run through until it stops.
- The machine will return to the READY
state.
Note: For the first few seconds the
Pump will make a louder than usual
noise as it begins pumping the water
through.
- Position Steam Wand over the Drip
Tray.
- Turn DIAL to
.
- Allow water to run through for 20 sec.
- Return DIAL to vertical position.
- The machine will return to the READY
state.
- Now the Espresso Machine should be
thoroughly primed.
- Wash Group Handle & Filter Basket in
warm water & dry before making your
first coffee.
- If water is not flowing from the Group
Head or Steam Wand, repeat Step 7.
- If water is still not running through,
contact Breville Customer Care. Details
are on the back page.
THERMOBLOCK
INSERT
58MM CAFÉ GROUP HEAD
CENTRE
9

Advertisement

Table of Contents
loading

Table of Contents