enervent EDX Planning, Installation And Operational Instructions Manual

Ventilation unit with heat pump

Advertisement

Quick Links

Enervent
greenair
®
Ventilation unit with heat pump
Planning, installation and operational instructions manual
Before installing and operating this unit,
please read this manual thorougly, and retain it for future reference.
www.enervent.fi

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EDX and is the answer not in the manual?

Questions and answers

Summary of Contents for enervent EDX

  • Page 1 Enervent greenair ® Ventilation unit with heat pump Planning, installation and operational instructions manual Before installing and operating this unit, please read this manual thorougly, and retain it for future reference. www.enervent.fi...
  • Page 2: Table Of Contents

    EXTERNAL WIRING DECLARATION OF CONFORMITY NOTE! All EDX-ventilation units are controlled with the EDA-automation. It is therefore important that You also read the EDA operation manual before starting up the system. In case the EDX and EDA operating manuals contain information...
  • Page 3: Type Marking

    7H1-J04 95U00081 Enervent® greenair Pelican eco EDX-E SF07SWN003211 Enervent® greenair Pegasos eco EDX-E Enervent® greenair Pegasos eco XL EDX-E Enervent® greenair LTR-3 eco EDX-E Enervent® greenair LTR-6 eco EDX-E Enervent® greenair LTR-7 eco EDX-E Enervent® greenair LTR-7 eco XL EDX-E...
  • Page 4: Operating Principal

    The heat energy is released from the refrigerant outside by the outside unit. Greenair EDX works as an additional heat source of the house as it economically produces over heated supply air with the heat pump technology.
  • Page 5: The System

    THE SYSTEM THE GREENAIR ECO EDX-E SYSTEM ASSEMBLY OUTSIDE UNIT COMP 1 COMP 2 Pingvin eco EDX-E Pelican eco EDX-E Pandion eco EDX-E Pegasos eco EDX-E LTR-3 eco EDX-E LTR-6 eco EDX-E LTR-7 eco EDX-E Pegasos eco EDX-E LTR-7 eco XL EDX-E...
  • Page 6: Installation Of The Edx-System

    The ventilation unit is installed according to the separate manual delivered with it. NOTE! LTR-6 and LTR-7 units have to be installed with the service hatch on the side if they are equipped with EDX. If the supply air coil isn’t built-in, it is to be instal- led in the duct.
  • Page 7: Principal Chart Of The Edx-System

    EDX-SYSTEM PRINCIPAL CHART Enervent® EDX EN 2010_1...
  • Page 8: Duct Heat Insulation

    Close the maintenance hatch carefully. NOTE! The unit should not be run with the hatch open. Greenair EDX is started by connecting the current to the unit. In this mode...
  • Page 9: Wiring Diagrams

    WIRING DIAGRAMS WIRING DIAGRAM eco EDX-E Enervent® EDX EN 2010_1...
  • Page 10 INTERNAL CONNECTIONS eco EDX OP. PANEL OP. PANEL...
  • Page 11 INTERNAL AND EXTERNAL CONNECTIONS Enervent® EDX EN 2010_1...
  • Page 12: Internal And External Wiring Hrw And Heat Pump

    INTERNAL/EXTERNAL CONNECTIONS...
  • Page 13: External Wiring

    EXTERNAL CONNECTIONS Central Vaccum Cleaner Indication Cooking hood Indication IN USE Overpressure Pushbutton (Accessory) Away, longer duration Away Overtime Pushbutton (Only In O ce Mode) (Accessory) External Alarm (Fire Hazard) Emergency Stop Enervent® EDX EN 2010_1...
  • Page 14: Declaration Of Conformity

    Enervent® greenair Pingvin eco EDX-E Enervent® greenair Pandion eco EDX-E Enervent® greenair Pelican eco EDX-E Enervent® greenair Pegasos eco EDX-E Enervent® greenair Pegasos eco XL EDX-E Enervent® greenair LTR-3 eco EDX Enervent® greenair LTR-6 eco EDX Enervent® greenair LTR-7 eco EDX Enervent®...

Table of Contents