Page 1
Enervent greenair ® Ventilation unit with heat pump Planning, installation and operational instructions manual Before installing and operating this unit, please read this manual thorougly, and retain it for future reference. www.enervent.fi...
EXTERNAL WIRING DECLARATION OF CONFORMITY NOTE! All EDX-ventilation units are controlled with the EDA-automation. It is therefore important that You also read the EDA operation manual before starting up the system. In case the EDX and EDA operating manuals contain information...
The heat energy is released from the refrigerant outside by the outside unit. Greenair EDX works as an additional heat source of the house as it economically produces over heated supply air with the heat pump technology.
The ventilation unit is installed according to the separate manual delivered with it. NOTE! LTR-6 and LTR-7 units have to be installed with the service hatch on the side if they are equipped with EDX. If the supply air coil isn’t built-in, it is to be instal- led in the duct.
Close the maintenance hatch carefully. NOTE! The unit should not be run with the hatch open. Greenair EDX is started by connecting the current to the unit. In this mode...
Need help?
Do you have a question about the EDX and is the answer not in the manual?
Questions and answers