JLG 25AM Service And Maintenance Manual page 63

Table of Contents

Advertisement

7. Coat the threads of the socket and sleeve with lubricant
and install the socket by twisting it over the strands of
the cable and engage the threads of the sleeve with the
socket. Tighten until four threads or fewer are visible. If
more than four threads are visible, proof load the cable
and retighten the socket fitting. (There is no specific
requirement for torque.)
8. Inspect for proper assembly prior to loading the cable.
Strands visible through the inspection hole are your
assurance of a proper assembly.
NOTE: The end of the rope may not be visible in the inspection
hole after loading.
9. Install cable on machine and adjust per instructions
shown previously in Section 2.12, Mast Chains/cables
And Sequencing Cables Adjustment.
31215808
SECTION 2 - SERVICE PROCEDURES
2-35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

30am38am

Table of Contents